Net-metering in Bangladesh: what to prepare

Understand the equipment and utility approvals before planning export.

Check eligibility with your utility

Net-metering rules and application requirements can change. Confirm the current process with the electricity distribution utility serving your property; an export-capable inverter alone does not establish approval.

Prepare the technical information

Gather the electricity account details, site information, proposed panel and inverter ratings, electrical design and equipment documentation requested by the utility.

Agree the installation and approval scope

Ask who prepares the application, who follows up, what tests are needed and whether metering or connection costs are included. Do not export power before the required utility approvals are in place.

Estimate your backup requirements →

Your next chapter in clean energy.

Tell us what you want to power. Let’s find the right system together.