Check eligibility with your utility
Net-metering rules and application requirements can change. Confirm the current process with the electricity distribution utility serving your property; an export-capable inverter alone does not establish approval.
Prepare the technical information
Gather the electricity account details, site information, proposed panel and inverter ratings, electrical design and equipment documentation requested by the utility.
Agree the installation and approval scope
Ask who prepares the application, who follows up, what tests are needed and whether metering or connection costs are included. Do not export power before the required utility approvals are in place.
